EnLink was engaged as an expert team in forensic detailed seismic assessment to support the body corporate in their litigation versus their insurance company. The project entailed advanced computer modelling and seismic analysis (i.e., pushover, and non-linear time history analyses. Our detailed computer simulation revealed the presence of a critical structural damage in a hidden location, which was later confirmed in our intrusive site inspection. 
EnLink team proudly contributed to the safety of the tenants of 11 apartments in that building by revealing structural vulnerabilities of the building at the time. We strongly recommended seismic strengthening of the building.

 

272 Marine Parade

272 Marine Parade Deform Shape